01Marine Boiler — Complete Tube Bundle Renewal
Every tube of the auxiliary boiler was cut out, the tube sheet reamed, new tubes expanded and rolled in, then hydrostatically tested with the class surveyor present.
Selected work delivered in our Tuzla workshop and onboard — boiler, heat exchanger, pressure vessel and refractory projects.
01Every tube of the auxiliary boiler was cut out, the tube sheet reamed, new tubes expanded and rolled in, then hydrostatically tested with the class surveyor present.
02The exchanger was opened, plates cleaned and crack-checked, deformed plates replaced, and the pack re-gasketed and re-torqued to the maker's specification.
03A new shell & tube unit was built to the vessel's drawings: shell rolled and welded, tube bundle fabricated and inserted, then pressure tested before delivery.
04The pressure vessel was fabricated in our Tuzla workshop, welded to approved procedures and hydrostatically tested under class surveyor supervision.
05Set pressure verified on the test bench, the seat lapped, and the valve re-certified with a test report for the vessel's class records.
06Damaged refractory removed onboard, anchors renewed and castable applied and cured, restoring the combustion chamber without docking the vessel.
Share your vessel details and our team will respond the same day.